There's another deadline looming later in the year, so it's time to get back to work.
As part of the attic project, a lot of demolition was done in what was previously the butler's bedroom. The electrical and plumbing were roughed-in at the same time as the attic. That work involved cutting holes in the sub-floor.
The bulk of the framing got done, but the sub-floor never got patched. Hence the current task.
You'll note in this photo that there's not enough room for the sub-floor to clear the shower drain line (2x4 lying on edge on the far side of the drain).
So I'll be building up the floor a bit as well. Step one in this photo.
Sort of.
I had to adjust the drain first by hacking it off so I can raise it by the proper amount. It was either that or re-doing the whole length back to the vent (and probably further than that).
Obviously I still need another layer of sub-floor over this or there's no support for the shower pan over the drain line.
Tuesday, April 28, 2015