This should have been a post about progress on the master bath.
But it's not.
The light over the island in the kitchen has been acting strangely over the past couple of weeks.
It would occasionally flicker.
Or s l o w l y turn on after flipping the switch.
In the latter case, there was a slight delay which gradually became longer.
Finally, the delay became infinite (OK, technically it wasn't infinite; I got tired of waiting...).
I replaced the bulb and still no joy.
So I replaced the stinkin' fixture with one that won't fail.
It's very stylish. ;-)
Now if I can just get this bathroom done so I can drop a bomb in this d!*n kitchen.
Sunday, May 24, 2015
Sunday, May 10, 2015
New Master Bath - Part 2
Last weekend, after I finished patching the sub-floor, I started hanging drywall.
SWMBO was out of town lying on the beach with her girlfriends...
So I recruited Little Man and SWMBO, Jr. to help hang the sheets on the ceiling. Over the course of the day, we managed to get most of the ceiling done. It's a lot easier with a lift, but we only needed to hang 3 full-size sheets.
We also managed to get a couple of pieces on the wall before picking up SWMBO at the airport.
It was a busy week with other goings on (see rileyspockets.com).
Needless to say, not much else got done this week.
Until this weekend.
In between the other weekend activities, I managed to get the rest of the sheets hung on the walls. I also got the exterior of the shower stall done.
My Rotozip makes quick work of the holes that need to be cut. The bits are quite fragile however; they break on a pretty regular basis. I have the shop-vac attachment which really helps keep the amount of dust to a minimum.
SWMBO was out of town lying on the beach with her girlfriends...
So I recruited Little Man and SWMBO, Jr. to help hang the sheets on the ceiling. Over the course of the day, we managed to get most of the ceiling done. It's a lot easier with a lift, but we only needed to hang 3 full-size sheets.
We also managed to get a couple of pieces on the wall before picking up SWMBO at the airport.
It was a busy week with other goings on (see rileyspockets.com).
Needless to say, not much else got done this week.
Until this weekend.
In between the other weekend activities, I managed to get the rest of the sheets hung on the walls. I also got the exterior of the shower stall done.
My Rotozip makes quick work of the holes that need to be cut. The bits are quite fragile however; they break on a pretty regular basis. I have the shop-vac attachment which really helps keep the amount of dust to a minimum.
Saturday, May 2, 2015
New Master Bath - Part 1A
Earlier today I finished laying the sub-floor in the shower. It's built up 3/4-inch above the floor in the rest of the room, but that's OK. The shower pan would have forced it to a different height anyway. At least we now have solid backing over the entire space.
I also pieced in sub-floor chunks in the rest of the room.
In addition, I made some minor mechanical adjustments - the HVAC duct openings needed to be extended out past the furring strips, the attic's electrical feeder cable needed to be stapled down, and the same for the AC drain tube.
I have a little electrical rough-in to clean up, but that will extend into the hallway (I want to get rid of some of the knob-and-tube in the hallway).
However, there's a big stack of drywall in the hallway that needs to be moved first. Might as well hang it if I'm going to move it...
I also pieced in sub-floor chunks in the rest of the room.
In addition, I made some minor mechanical adjustments - the HVAC duct openings needed to be extended out past the furring strips, the attic's electrical feeder cable needed to be stapled down, and the same for the AC drain tube.
I have a little electrical rough-in to clean up, but that will extend into the hallway (I want to get rid of some of the knob-and-tube in the hallway).
However, there's a big stack of drywall in the hallway that needs to be moved first. Might as well hang it if I'm going to move it...
Tuesday, April 28, 2015
New Master Bath - Part 1
There's another deadline looming later in the year, so it's time to get back to work.
As part of the attic project, a lot of demolition was done in what was previously the butler's bedroom. The electrical and plumbing were roughed-in at the same time as the attic. That work involved cutting holes in the sub-floor.
The bulk of the framing got done, but the sub-floor never got patched. Hence the current task.
You'll note in this photo that there's not enough room for the sub-floor to clear the shower drain line (2x4 lying on edge on the far side of the drain).
So I'll be building up the floor a bit as well. Step one in this photo.
Sort of.
I had to adjust the drain first by hacking it off so I can raise it by the proper amount. It was either that or re-doing the whole length back to the vent (and probably further than that).
Obviously I still need another layer of sub-floor over this or there's no support for the shower pan over the drain line.
As part of the attic project, a lot of demolition was done in what was previously the butler's bedroom. The electrical and plumbing were roughed-in at the same time as the attic. That work involved cutting holes in the sub-floor.
The bulk of the framing got done, but the sub-floor never got patched. Hence the current task.
You'll note in this photo that there's not enough room for the sub-floor to clear the shower drain line (2x4 lying on edge on the far side of the drain).
So I'll be building up the floor a bit as well. Step one in this photo.
Sort of.
I had to adjust the drain first by hacking it off so I can raise it by the proper amount. It was either that or re-doing the whole length back to the vent (and probably further than that).
Obviously I still need another layer of sub-floor over this or there's no support for the shower pan over the drain line.
Tuesday, February 17, 2015
Sludge
In science class at my kids' school they have a project called "Sludge". Each student gets a jar full of unidentified material and the student performs various experiments to determine what components are in their mixture.
One of the sinks in the kids' bath has been draining slowly, so I took it apart today to see what the issue was.
It was sludge.
The tailpipe on the boys' sink was mostly clear. The one on the girls was lined with this.
I'm not sure what it is really. There's a little bit of hair in it, but it's mostly a thick layer of goop around the inside of the pipe.
Is it several years worth of makeup residue?
Sunday, February 15, 2015
It's Slowly Spreading
The horse theme has begun to spread from the study bath.
Here's the back story: There's an English hunting motif on the study bath's door, which led us to carry the theme into the bathroom. The walls have a faux antique leather finish and we found an English riding helmet, crop, and boots. We also found some artwork depicting old English fox hunts to tie everything together.
All this has been done for quite some time.
Fast forward to today where the two horses have been hung, one on either side of the window near the entrance to the study bath. The two pieces came from SWMBO's uncle who recently passed away.
Of course, there was artwork there already, but...
It wasn't meant to go there.
So they came down and have been moved to their originally intended location, the vestibule.
More nail holes to bug me...
On the other hand, that laser level I bought has come in handy when hanging these.
Here's the back story: There's an English hunting motif on the study bath's door, which led us to carry the theme into the bathroom. The walls have a faux antique leather finish and we found an English riding helmet, crop, and boots. We also found some artwork depicting old English fox hunts to tie everything together.
All this has been done for quite some time.
Fast forward to today where the two horses have been hung, one on either side of the window near the entrance to the study bath. The two pieces came from SWMBO's uncle who recently passed away.
Of course, there was artwork there already, but...
It wasn't meant to go there.
So they came down and have been moved to their originally intended location, the vestibule.
More nail holes to bug me...
On the other hand, that laser level I bought has come in handy when hanging these.
Saturday, February 14, 2015
Bubbles
One of the errands while we were running around today was picking these up. We'd picked fabric through a decorator we've been using and they finally came in. They replace the chairs that were photo-bombing in a recent post.
The pattern isn't quite as wild in person as it appears in the photo. The fabric really picks up the colors in the room & the other accessories and helps unify things a bit more.
As always, there was concern about getting things up the attic staircase because it is quite narrow and has a couple of 90-degree turns. The chairs *just* fit through the doorway at the bottom of the stairs.
The pattern isn't quite as wild in person as it appears in the photo. The fabric really picks up the colors in the room & the other accessories and helps unify things a bit more.
As always, there was concern about getting things up the attic staircase because it is quite narrow and has a couple of 90-degree turns. The chairs *just* fit through the doorway at the bottom of the stairs.
Sunday, February 8, 2015
The Silver Cup
Here are more examples of why some people refer to Saint Paul as "Saint Small".
Long-time readers of this blog will remember the very first post, in which I shared a little information about the first two owners. The silver cup in this picture is on display at Town & Country Club. It was won by none other than the second owner of our house, P. Dean Gribben. At some point it would be interesting to talk with the club historian to learn more about this cup, as well as why it is on display.
And another interesting coincidence, the original Town & Country Club was designed by the same architect as our house; Cass Gilbert.
Long-time readers of this blog will remember the very first post, in which I shared a little information about the first two owners. The silver cup in this picture is on display at Town & Country Club. It was won by none other than the second owner of our house, P. Dean Gribben. At some point it would be interesting to talk with the club historian to learn more about this cup, as well as why it is on display.
And another interesting coincidence, the original Town & Country Club was designed by the same architect as our house; Cass Gilbert.
Monday, January 19, 2015
Wait Until It's Done
SWMBO complains that I post pictures before everything is done.
If I waited until it was done, I wouldn't get to post any pictures at all. There's still something to do in every room we've "done"...
Yesterday, for example, we finally acquired and hung the last picture in this grouping. They are wedding photographs of us, our parents, and grandparents. We've been trying to acquire a copy of the photo of the last set of grandparents for quite some time and it finally arrived. It would be cool if we could get wedding photos of the great-grandparents, but I'm not sure that photos ever existed.
And SWMBO is probably going to be cheesed that I took this picture before all the knick-knacks were put back after un-decorating for the holidays.
You can't win...
More bits have also been trickling in for the attic. In the big room, the window treatments are in, as are the window seat cushions and some of the pillows. The brown chair photo-bombing the lower left corner of the picture is temporary. The real ones will be in soon, supposedly.
For reference, this is one of the attic dormers at the front of the house.
The hipped roof detail that is reflected on the inside of the house is a unique touch that turned out really well.
If I waited until it was done, I wouldn't get to post any pictures at all. There's still something to do in every room we've "done"...
Yesterday, for example, we finally acquired and hung the last picture in this grouping. They are wedding photographs of us, our parents, and grandparents. We've been trying to acquire a copy of the photo of the last set of grandparents for quite some time and it finally arrived. It would be cool if we could get wedding photos of the great-grandparents, but I'm not sure that photos ever existed.
And SWMBO is probably going to be cheesed that I took this picture before all the knick-knacks were put back after un-decorating for the holidays.
You can't win...
More bits have also been trickling in for the attic. In the big room, the window treatments are in, as are the window seat cushions and some of the pillows. The brown chair photo-bombing the lower left corner of the picture is temporary. The real ones will be in soon, supposedly.
For reference, this is one of the attic dormers at the front of the house.
The hipped roof detail that is reflected on the inside of the house is a unique touch that turned out really well.
Saturday, November 29, 2014
The Doorbell
Sometime during the attic demolition the front doorbell quit working. Fixing it was low on my priority list, obviously (it's been at least a year since it last worked...).
So that's my excuse if you stopped by and we didn't answer the door. It was nothing personal. ;-)
My lack of motivation to fix it can also be attributed to the mess of wires in the picture. I just wasn't looking forward to figuring out which ones were for the doorbell. They all seemed to be connected to the bell's transformer in one way or another.
And other wires were too.
I think over time there were a number of "clever" people who connected various things together to make noise with as little wire as possible.
Doorbells. Phones. Switches/buttons in various rooms to summon "The Help".
Splices everywhere.
Partially visible wires that eventually disappear into a wall or ceiling.
3 hours of tracing wire just to get back to where I started the day: with the back doorbell working after I removed as much wire as I thought prudent.
Then 2 more hours tracing the front doorbell wiring, trying to determine where all the splices are going.
Finally I just gave up and cut the splices. Wherever they were going wasn't working anyway...
But the front doorbell is working again.
So that's my excuse if you stopped by and we didn't answer the door. It was nothing personal. ;-)
My lack of motivation to fix it can also be attributed to the mess of wires in the picture. I just wasn't looking forward to figuring out which ones were for the doorbell. They all seemed to be connected to the bell's transformer in one way or another.
And other wires were too.
I think over time there were a number of "clever" people who connected various things together to make noise with as little wire as possible.
Doorbells. Phones. Switches/buttons in various rooms to summon "The Help".
Splices everywhere.
Partially visible wires that eventually disappear into a wall or ceiling.
3 hours of tracing wire just to get back to where I started the day: with the back doorbell working after I removed as much wire as I thought prudent.
Then 2 more hours tracing the front doorbell wiring, trying to determine where all the splices are going.
Finally I just gave up and cut the splices. Wherever they were going wasn't working anyway...
But the front doorbell is working again.