Wednesday, September 14, 2011

Kid's Bath - Part 3


Any wonder why there was no water pressure in this bathroom?

It's amazing water could get through this pipe at all.

The radiator under the window came out today, so all the demo is done.

The electrical rough-in is done and the inspector gave it a passing grade.

All the plumbing waste and vent rough-in is done, but the new supply lines are 85% done. Once the new shower framing is done the supply lines can be finished, too.

As always, several new photos have been added to the slideshow.