Now I have enough electrical done that I can close up my access points from the master bath.
So I quickly hung the rest of the dry wall.
And started throwing some mud around.
I'm hoping to get it done while I'm waiting for the in-floor radiant heat supplies to arrive.
Once they are here, I can quickly run that before the tile guy comes at the end of the month.
These are 9-foot ceilings which explains the gap in the drywall at the bottom of this one wall. The in-floor heat manifold will go there. Once they are installed, I'll be able to rock that bottom foot.