The final coat of mud went on last weekend.
Early in the week everything got sanded.
Late in the week the painter was here to prime and put on a coat of ceiling white.
There's also a stack of hardwood floor boards in the hallway acclimatizing to their new home.
Next week the plan is to level the floor and start installing the in-floor hydronic heating system.
The in-floor heat will get connected to the same system panel as the master bathroom, but the method and components for installing the tubing in the kitchen floor are different.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment