Adventures in restoring the "Emerson Hadley House" - an historic home built in 1895 and designed by the noted architect Cass Gilbert.
Yesterday the closing finalized.
Our stewardship journey has ended and the baton has been passed.
We'd been thinking for a while about downsizing. We had a particular new development in mind and the timeline seemed to fit what we had in mind, but it turned out to not be the right fit for a number of reasons.
So we switched gears and started thinking abut other options. In the process of exploring the new idea, some interesting properties popped up and we looked at them to get a feel for things. They sold quickly which was OK, because we still had the longer timeline in mind. And we learned enough to confirm the new direction as a possibility when the time came.
Then, out of the blue, we heard about a place that would soon be coming up for sale. We went and saw it and bought it before it even went public.
As of today, Farrington is on the market.
Over the past couple of years, we've slowly been tackling the brick work.
Mostly that's just been tuckpointing. The plan was to do on side of the house at a time to manage costs.
This year was the south-facing wall.
It required more than just tuckpointing though. The brick columns between the original kitchen windows in the basement supported the entire south wall at the back of the house. It was time to give them some help.
The back door was practice for the front door.
I didn't have time last fall to refinish the front door before it got cold. Once it got warm enough this spring I started the prep work.
Scope included the outside of the door, both sides of the screen door, the side lights, and the sunburst/transom.
It took quite a bit of time to strip the old gummy varnish and gently sand things down by hand to good wood without damaging any of the detail.
Then multiple coats of varnish until I achieved the desired result. Many days passed between coats waiting for the right weather conditions, but it's finally done.
As with the back door, the front door got new bronze screen.
The study bath was another one of those projects that didn't quite get completed. (Previous post about this room)
This room was mostly done except that I didn't paint the woodwork and I didn't strip and repaint the radiator. Because I didn't want to deal with it at the time, I allowed myself to get distracted with other projects. Now I have no excuses.
There isn't much woodwork to be painted in this room. A single small window, the rolling door to the storage area under the stairs, and the back side of the entry door.
The woodwork preparation exposed quite a history of color in the the various layers of paint. The oldest is cream, followed by tan, federal blue, red, green, and then a couple of variations on off-white/cream. I used Ivory Tusk, since I still have some of that and it's not far off the oldest of the colors...
There's been a long delay between this post and the previous one for the attic bathroom. That's because I never really finished the work. I got 95% done and got distracted with other things.
The remaining work was installing the door latch and then painting the window frame and door.
The latch came with a nice template, but the template was for a 1-1/2 inch thick door. This door is 1-3/4 so I had to cut the template apart and line up the pieces with a laser level. One piece for the edge of the door, another for the face, and the third for the jamb.
I lined up the template with the existing mortise for the old latch to minimize the amount of material I had to remove, as well as minimizing the amount of filling. There were some areas that needed to be filled because it looked like a previous owner's dog had chewed significantly into the edge of the door. I used Abatron WoodEpox and am happy with the results.
It took a little while to remove the material and dry fit the latch. Then I did all the surface prep and primed the places where there was bare wood.
Then came the Impervo as the topcoat in the usual color, Ivory Tusk, to match the rest of this part of the attic.
The rest of this post is the free tour...
There are other decorations scattered throughout the house but none are significant enough to warrant inclusion here.
Merry Christmas to all and to all a good night.
The house had been re-roofed shortly before we bought it, but the carriage house was not done at the same time. The seals in the double-paned skylights had failed, so the glass was foggy, but the roof wasn't leaking. No big deal from our perspective; we could wait and do some other things first.
Well, eventually we started to get some small water stains around one of the skylights, so it was time.
We contacted a couple of local roofers to get estimates and picked one. It took a while to get scheduled, but we weren't in a hurry. Eventually, after some weather- and COVID-related delays, the day arrived.
They were able to strip the old shingles off and install the new ones in (almost) a day. The removed the old skylights and installed new ones while they were at it. Because of the hipped roof, they ended up a little short on the cap shingles, so those had to be delivered and installed later in the week.
This is another one of those posts that's not really about the house. It's about a common issue that isn't really that hard to fix.
Once again one of the bathroom sinks was draining slowly. We took all the items out of the cabinet under the sink. I disconnected the actuator for the stopper and removed it. The stopper was full of hair and other gunk so I cleaned it.
Weird.
I called the plumbing supply place where we purchased the fixture to see what options we had. If we could find the order/receipt and send some photos, they would submit a warranty claim with the manufacturer.
I found the necessary papers, took photos of the papers & broken pieces, and emailed the photos.
A week passed and I heard nothing. No reply to the email. No phone call. Nothing.
I called. He did not answer the phone, so I left a voicemail.
A week passed. No return call. No email. Nothing.
I had a Friday off and was running errands more-or-less in the neighborhood, so decided to stop in to get an update.
I introduced myself and explained why I was there.
Turns out he had received the email and had submitted all the information to the manufacturer. They had agreed to replace the part at no cost, but because the finish is not one of the most common (satin brass rather than nickel or chrome) it might take a while to get one. He wasn't sure when they might ship it or whether they would ship it to him or directly to me.
Two more weeks passed. The new part was shipped directly to me. I received it yesterday and installed it without issue last night.
So, here's my frustration. Communication. Why is it that businesses are so bad at communication? It's the simplest thing that requires so little effort and makes such a huge difference.
Did I mention that I was the only customer in the store? Did I mention that every time we've been in the store (many times over the years for the kitchen and this bathroom) we've been the only customer on the premises? Given that, how much time does it take to reply to an email to say you've received it? Or return the phone call which specifically asked if you'd received the email? Should I really have to come in person to get an update when you're only open from 9am-4pm on weekdays?
Manufacturer instructions on the pump say it should not be allowed to freeze. As the weather started to get colder, it was time to remove the pump for the winter.
The first step was to move the rocks from atop the pump access cover and then remove the cover plate.
Then, with Hayden’s help, reach into the basin, remove the pump, disconnect the hose, push the hose back into the basin, and pull the cord through its cutout. I put the pump into a bucket and brought it into the basement for the winter.
Lastly, put the cover back in place and cover it with rocks again.
Once everything thaws in the spring, I can reinstall the pump.
Last fall when the front porch got a new roof, the guys removed the storms for the Pedimented Window. The storms didn't get reinstalled because they needed some work first.
The oldest of the glazing compound was failing and the paint was starting to peel. Over the past couple of weeeks in the down periods waiting for varnish to dry, etc on the the back door, I scraped, sanded, and removed the glass from these storms. Of course, when removing the glazing compound and glass I broke one of the panes (the one I'd replaced last time, I think. Its putty was in good shape but I figured I'd do a full restoration...). Fortunately I had a piece of glass that was big enough. It just needed to be cut down to the correct size.
I'm using Sarco putty this time. It's way easier to work with. I highly recommend it.
There is no way for me to get all the prep work done on a timeline that still allows me to be varnishing at reasonable temperatures before the snow flies.
The final two coats used Epifanes' Wood Finish Matte sanding with 320 before the first coat and in between coats. The resulting satin finish looks great in my opinion.
And then finished installing the weatherstripping on the hinge side and top of the door frame.
As usual, the screws for the doorknob escutcheons are a mishmash. Of the four, only one is correct; the other three don't match (and even then they are not self consistent...). I've already gone through my stash of saved hardware and don't have ones that match the correct one. So another trip to the store to get the correct size and length...
And the local neighborhood hardware store for the win!
Get up.
Remove the hardware.
Sand.
Vacuum.
Tack rag.
Varnish.
Wait 12 hours for it to dry.
Reinstall the hardware for the night.
Wash. Rinse. Repeat.
This weekend I plan to do the final two coats.
Drilled out and glued dowels into oversized screw holes for the hinges, etc. and installed the new spring bronze weatherstripping, including lockstrips.
Everything fits properly and no daylight shining through the gaps!
Mostly that involved using a chemical stripper to get the old finish off and then sanding with progressively finer sandpaper to get the surface fully prepared.
Then a once-over with the vacuum and a wipe-down with a tack rag to get a dust free surface.
The recommendation I got was 2 coats of Pettit Marine Captain's Varnish (sanding with 240 in between coats) followed by 2 coats of Epifanes' Wood Finish Matte (using 320 in between coats).
The Captain's Varnish has a bit of an amber hue to it which darkens and warms the wood tone nicely.
Based in this first coat, I think I might be doing 3 coats of the Captain's Varnish, but time will tell.
While I've been preping the back door, I've also been chipping away at the back screen door. It has a number of issues as well:
This is the first in what I know will be several posts about the back door. It has a number of issues that need to be corrected.
Ever since we moved in we'd talked about putting a fountain in the "grotto" in the wall at the back of the property.
A couple of years after we moved in and had been doing a lot of work, we were at a party and met a local architect who is regarded as an expert on Cass Gilbert houses. He mentioned that he liked our renovation work and that he previously had lived in the house immediately behind ours (see the red garage in the first photo). He said that there indeed had been a fountain in the grotto years ago. He had rented out the second floor of his house to some college students and when they eventually moved out, they left behind what he believed was the original fountainhead from our fountain. He had it at his second home an hour or so away and would be willing to return it to us. Though we've worked with him on Cass Gilbert Society functions several times since, we never got it from him. I'm not certain he recalls the offer due to various other circumstances, so we had to make alternate plans.
The grotto had a bunch of dirt and decomposed material in it. In addition, SWMBO had been dumping our old potting soil in there. So the first step was to dig all that out. I discovered that at the bottom there was an old layer of concrete. It was cracked in several places and was uneven. In addition, the stones surrounding the basin had shifted over time and had large gaps between them, so there was no way to make it water tight.
After some unfortunate delays with our contractor (abdominal surgeries, bee stings, car accidents, and a need to re-make the half-columns after the first set wasn't done properly), the front is finally done.
All the previous repairs have been painted.
Some of the round columns needed repairs to their bases. All have been repaired with new wood, joints caulked, and repainted.
The new half-columns against the house have been assembled, installed, and painted.
We'll have to work on removing the "ghost marks" from the previous columns.