Attic Framing Is Done

The framing is done.The front of the house is framed as one large room (see plan at right).

The knee walls around the perimeter are 5-feet tall.  That still gives us plenty of floor space while not making the ceiling feel too low around the edges.  The two dormers at the top of the drawing face the street.  The double doors at the bottom of the drawing lead from the hall and are the connection point to the next drawing.
The double doors are at the top of this drawing.  They mark the transition from the guest "suite" hallway into the big room.  The bathroom isn't huge, but it is functional.  We spent some time at the tile store today figuring out what we want and think we have a plan.  The guest bedroom is quite large, but the closet is not.  If you don't have a lot of room for clothes, you can't out-stay your welcome...  ;-)

Next up will be mechanical infrastructure - electrical, plumbing, HVAC, and insulation.  Though we'll first have to do some demolition in the room below the guest bedroom to move the plumbing stack.

No comments:

Post a Comment