Saturday, November 21, 2015

Plumbing

The plumbing became quite the saga over the past couple of weeks.

A while back the plumber came and installed the toilet, shower heads, and lavatory faucets.  He was missing parts for the tub and hot water recirculator, so needed to come back later.

As part of checking things out during the install, a bunch of crud came out of each fixture.  He took it to get tested and it tuned out to be lime scale.  After investigating to determine the source, it turns out that the water heater was way past its useful life and a third full of mineral deposits.  I guess I shouldn't be surprised, it's one of the few remaining appliances that we hadn't yet replaced.  So he ordered a new one to be installed when they came back later to finish the tub.

A few days later I happened to be down in the basement gathering stuff for another project and noticed a decent sized puddle in the corner where the drain lines for the sinks were.  I checked the pipes themselves for the source of the leak with no joy.  But I notices they tapped into the drain for the old kitchen sink in the basement.  Now, that drain probably hasn't had a sink connected to it since before the 1980s.  There's no telling whether it works or not.

Turns out not.

When they came back, they tried to snake it with no success.  So they re-routed the pipe in the basement over to where it could catch the stack for the toilet.  Problem solved.

They also finished installing the tub, the water heater, and the hot water recirculator.

Texting SWMBO at 7pm the night before to see if the electrician (me) had installed the outlet for the pump caused a bit of panic.  I had to do some quick planning and run to the store to get parts that night.  I got it only half installed, so ran an extension cord until I could finish it up the next night.

The bathroom is now totally functional and in use.  And it's nice to have instant hot water.

We don't have window treatments, yet which explains the builder paper on the bottom sash of each window and the fabric samples taped to the casing.  I don't need the neighbors getting too excited every time I'm in here...

This morning I finished installing the crown molding at the top of the corner cabinet.  It took longer than expected because during the installation I mis-measured and cut the pillars too short.  As a result I had to fabricate a filler piece for each side and shave it down to the correct thickness.

Now that we've seen the sashes in different types of light, I know I have to do a second coat on each one.  Hence the tape still on each pane of glass.  I have to re-install the bathroom doors and they have to be painted too, so I'll do the rest of the painting in one shot.