Most of the mudding is done. Or at least enough that I can start priming in the big areas.
Life is getting in the way a bit so it's going slower than I'd hoped.
The bedroom has a first coat of primer.
And I have the ceiling and a third of the walls in the hallway done as well.
That's all the further five gallons of primer will go on fresh drywall.
I would be remiss if I didn't give a shout out to The Little Man - he's doing a bang-up job on cutting in for me.
Monday, February 17, 2014
New Attic Bathroom - Part 2
All the tile is installed and grouted. And the niche is finished as well.
We'd picked out a base tiles to run around the perimeter of the room, but didn't realize its top edge wasn't finished. Instead we'll be installing a wooden base molding. Not the end of the world.
Now we're just waiting on the final coats of mud and I can start priming in here.
We'd picked out a base tiles to run around the perimeter of the room, but didn't realize its top edge wasn't finished. Instead we'll be installing a wooden base molding. Not the end of the world.
Now we're just waiting on the final coats of mud and I can start priming in here.
Monday, February 10, 2014
The New Attic Bathroom - Part 1
Enough stuff is happening that it's time break this up into separate threads.
When I got home tonight, this is what I found.
Compare and contrast this floor with the old floor in the attic bathroom. Much nicer, I'd say.
The new bathroom is in the same location, but the new one is ever so slightly larger and the layout is also going to be slightly different. The old layout was was perfectly functional for the servants, but it was a little wonky. The only lights in the room were attached to the medicine cabinet which was on the left wall behind the door. It made shaving quite an adventure when we were doing the kid's bath.
Rather than being an in-swinging door, the new one will be a pocket door - pocket on the right edge of the picture. The door is one that was re-purposed from elsewhere in the house.
The floor tile is a variation on a traditional hex pattern. The shower wall tile is a traditional subway tile with a decorative strip at eye level. The niche will get tiled as well.
We're also intending to re-install the attic bath's toilet and use the pedestal sink that used to be in the master bath.
When I got home tonight, this is what I found.
Compare and contrast this floor with the old floor in the attic bathroom. Much nicer, I'd say.
The new bathroom is in the same location, but the new one is ever so slightly larger and the layout is also going to be slightly different. The old layout was was perfectly functional for the servants, but it was a little wonky. The only lights in the room were attached to the medicine cabinet which was on the left wall behind the door. It made shaving quite an adventure when we were doing the kid's bath.
Rather than being an in-swinging door, the new one will be a pocket door - pocket on the right edge of the picture. The door is one that was re-purposed from elsewhere in the house.
The floor tile is a variation on a traditional hex pattern. The shower wall tile is a traditional subway tile with a decorative strip at eye level. The niche will get tiled as well.
We're also intending to re-install the attic bath's toilet and use the pedestal sink that used to be in the master bath.
Saturday, February 8, 2014
This Is Not A Big Ball Of Mud
Day by day the stack continues to get smaller.
More finds its way to the walls and ceiling. Sometimes it feels like you've walked into a tropical greenhouse with all the moisture in the air as it dries.
The big wall and its "cuddle nook" are taking shape. And you can really get a sense of what the space is going to be like.
Especially around the dormers that overlook the Cathedral. It will be a cool view when Red Bull's Crashed Ice is here in a few weeks.
More finds its way to the walls and ceiling. Sometimes it feels like you've walked into a tropical greenhouse with all the moisture in the air as it dries.
The big wall and its "cuddle nook" are taking shape. And you can really get a sense of what the space is going to be like.
Especially around the dormers that overlook the Cathedral. It will be a cool view when Red Bull's Crashed Ice is here in a few weeks.
Thursday, January 30, 2014
I Love The Smell Of Mud In The Morning...
Well, it's more in the evening actually.
Every night when I get home from work there's the faint smell of fresh mud.
It's the smell of progress...
One additional little treat today was the creation of the pan and installation of most of the the backer board in the shower.
Every night when I get home from work there's the faint smell of fresh mud.
It's the smell of progress...
One additional little treat today was the creation of the pan and installation of most of the the backer board in the shower.
Tuesday, January 28, 2014
Joy in Mudville
While I was busy at work today, lots of mud got slung around the attic.
Most every surface has at least some, including the guest bedroom,
the hall, and
my room. ;-)
Most every surface has at least some, including the guest bedroom,
the hall, and
my room. ;-)
Saturday, January 25, 2014
The Old Master Bath - Part 9
I suppose at this point I shouldn't be calling this the old master bath. It should now probably be properly called Her Dressing Room...
The shade arrived recently and I quickly installed it. I'm sure the neighbors have been getting a thrill in the meantime.
Those with a keen eye will also note the new details on the panels in the left of the picture. We'd been toying with the idea for a while and...
You might recall that there was an article about us and the house in The Highland Villager just before the Ramsey Hill House tour back in September. The author had brought his wife along and we gave them both a tour as part of the interview. She is artist and one of her friends specializes in doing work like this, so naturally we got to talking and one thing led to another.
Last week she was here and did these cool little pieces.
The shade arrived recently and I quickly installed it. I'm sure the neighbors have been getting a thrill in the meantime.
Those with a keen eye will also note the new details on the panels in the left of the picture. We'd been toying with the idea for a while and...
You might recall that there was an article about us and the house in The Highland Villager just before the Ramsey Hill House tour back in September. The author had brought his wife along and we gave them both a tour as part of the interview. She is artist and one of her friends specializes in doing work like this, so naturally we got to talking and one thing led to another.
Last week she was here and did these cool little pieces.
Wednesday, January 22, 2014
Got Mud?
Now it's going to get interesting...
All this is going to get spread around the walls and ceilings over the next couple of weeks.
I'm going to let the professionals have this one. They can do it much faster and better than I can. And I have other stuff I need to do.
All this is going to get spread around the walls and ceilings over the next couple of weeks.
I'm going to let the professionals have this one. They can do it much faster and better than I can. And I have other stuff I need to do.
Monday, January 20, 2014
Rockin' - Part 3
Despite the self-inflicted problem from the previous post, things have been progressing.
The bedroom is done. As is the hallway (except where it had to come down so I could re-wire).
All that's left is the interior of the two closets, interior of the bathroom, the ceiling in the big room, and the walls in the stair case.
Then mud and tape.
We have been thinking about various fixtures, flooring options, colors, etc and have already chosen some. So we're ready when the time comes.
The bedroom is done. As is the hallway (except where it had to come down so I could re-wire).
All that's left is the interior of the two closets, interior of the bathroom, the ceiling in the big room, and the walls in the stair case.
Then mud and tape.
We have been thinking about various fixtures, flooring options, colors, etc and have already chosen some. So we're ready when the time comes.
Two Steps Forward; One Step Back
This should have been a post showing a bit more progress, but...
Note the lack of drywall on parts of the ceiling and wall in the hallway. Their used to be drywall installed there, but it had come down.
After the drywall was hung in the hallway, I installed some temporary lights (see bare-bulb fixture hanging from the ceiling where there is drywall...).
And discovered that I messed up the wiring for the hallway fixtures controlled by the 3-way switches.
Arrrrgh.
That meant I needed to re-wire that leg of the circuit and therefore the drywall had to come down in a couple places. Better that I discovered it now rather than after it was all mudded, taped, and painted...
The reference book I've been using describes how to wire single fixtures controlled by 3-way switches. You can follow the same instructions when wiring multiple fixtures, EXCEPT when the fixtures are wired between the switches. I found a decent on-line reference for how to do it - note the difference between options 3 and 7. As an aside, I ended up re-wiring it like option 5...
Note the lack of drywall on parts of the ceiling and wall in the hallway. Their used to be drywall installed there, but it had come down.
After the drywall was hung in the hallway, I installed some temporary lights (see bare-bulb fixture hanging from the ceiling where there is drywall...).
And discovered that I messed up the wiring for the hallway fixtures controlled by the 3-way switches.
Arrrrgh.
That meant I needed to re-wire that leg of the circuit and therefore the drywall had to come down in a couple places. Better that I discovered it now rather than after it was all mudded, taped, and painted...
The reference book I've been using describes how to wire single fixtures controlled by 3-way switches. You can follow the same instructions when wiring multiple fixtures, EXCEPT when the fixtures are wired between the switches. I found a decent on-line reference for how to do it - note the difference between options 3 and 7. As an aside, I ended up re-wiring it like option 5...
Subscribe to:
Posts (Atom)