This week the guys have removed all the plaster from the basement ceiling. It was a nasty, dirty job. They filled a huge dumpster with all the plaster and lath.
Now we have clear access to the joists and can easily see where everything goes from an electrical and plumbing perspective. And we'll be able to tuck replacement wires and pipes up in the joist cavities so they're out of the way - then I can heal the goose-eggs on my noggin'. :-)
No comments:
Post a Comment