The electricians have been here on-and-off over the last few weeks doing some prep work for upgrading the electrical service. We've had them remove some sconces that were in odd places, add a couple of ceiling fixtures for chandeliers, add switches to comrol some existing lights, and add a few outlets. They've also done some stuff as required by code (e.g., add GFCI outlets in the bathrooms).
This photo shows the new chandelier in the master bedroom - note the absence of the sconces from previous posts! The ceiling still needs to be painted now that we've removed the old fabric that was falling down.
No comments:
Post a Comment