Tuesday, September 6, 2016

Kitchen - Week 13

Not much happened last week.

The appliances were delivered, but not installed. Mostly because we're still waiting for the rest of the cabinets to be delivered.

The fridge is near to its final position and the dishwasher is tucked back in the corner so that it's out of the way in the interim. Both will have cabinet panels installed eventually.

The range will slide back against the wall when it is finally installed. It's a "dual-fuel" model with gas cooktop and electric ovens.

The dishwasher will be installed in the gap in the island cabinets with the sink immediately next to it (camera's right).

The chunk of stone on the leftmost island cabinet is a sample of the counter material. Once all the base cabinets are installed the stone guy can come back and laser measure for the counters.